staging a new CSR IOS-XE image?
Posted: Wed Feb 24, 2021 10:21 am
is it possible to stage 2 versions of IOS-XE Everest in eve-ng?
We already have numerous CSR's deployed running csr1000vng-universalk9.16.05.02.Everest, but we need to test a feature in csr1000v-universalk9.16.06.06 (also Everest)... is it possible to use the instructions from your how-to
just load this new version? Would be able to pick from the 'add node' dropdown? Would both images be able to run in parallel without issues?
Thanks!
We already have numerous CSR's deployed running csr1000vng-universalk9.16.05.02.Everest, but we need to test a feature in csr1000v-universalk9.16.06.06 (also Everest)... is it possible to use the instructions from your how-to
just load this new version? Would be able to pick from the 'add node' dropdown? Would both images be able to run in parallel without issues?
Thanks!